Our Projects

AL SALAMAH

TYPE: YACHT
DIMENSIONS: L:139 W:24
DURATION OF WORKS: 4 DAYS
MARCH 2023
SPANOPOULOS SHIPYARDS

SHIP BERTHED IN DRYDOCK.
RECEIVED HYDROBLASTING 1500 BAR – PAINTING BY ROLLER: UNDERWATER HULL AREA – TOP SIDES.

FALMOUTH

TYPE: CONTAINER
DIMENSIONS: L:134 W:22.5
DURATION OF WORKS: 8 DAYS
NOVEMBER 2023
PERAMA SHIP REPAIR ZONE

SHIP BERTHED IN DRYDOCK.
RECEIVED HYDROBLASTING 1500 BAR – PAINTING: UNDERWATER HULL AREA – TOP SIDES – SEA CHEST – RUDDERS – ANCHOR CHAINS.
RECEIVED HYDROBLASTING – PAINTING : AT CARGO HOLDS – HATCH COAMINGS – DECK.
RECEIVED CLEANING – GAS FREE: FUEL TANKS – BALLAST TANKS

CROWN IRIS

TYPE: CRUISE SHIP
DIMENSIONS: L:207 W:33.2
ICE CLASS: 1A SUPER
DURATION OF WORKS: 10 DAYS
DECEMBER 2023
PERAMA SHIP REPAIRS ZONE

SHIP BERTHED IN DRYDOCK.
RECEIVED HULL UNDERWATER AREA: HYDROBLASTING EQUAL TO SA2.5 CLEANLINESS – SILICON PAINTING – 6 COATS.
SEA CHEST – RUDDERS – STABILIZERS: HYDROBLASTING – PAINTING.
ALONGSIDE WITH MARKING : PLIMSOL MARKS – DRAFT MARKS.

EL. VENIZELOS

TYPE: RO-PASSENGER
DIMENSIONS: L:175 W:28
DURATION OF WORKS: 8 DAYS
FEBRUARY 2023
PERAMA SHIP REPAIR ZONE

SHIP BERTHED IN DRYDOCK.
RECEIVED HYDROBLASTING 1500 BAR – PAINTING: UNDERWATER HULL AREA – TOP SIDES – SEA CHEST – RUDDERS – ANCHOR CHAINS.-> 2 DAYS.
RECEIVED HYDROBLASTING – PAINTING: GARAGE AREAS – EXTERNAL DECKS.

ELYROS

TYPE: RO-PASSENGER
DIMENSIONS: L:192 W:28
DURATION OF WORKS: 6 DAYS
APRIL 2023
PERAMA SHIP REPAIR ZONE

SHIP BERTHED IN DRYDOCK.
RECEIVED HYDROBLASTING 1500 BAR – PAINTING: UNDERWATER HULL AREA – TOP SIDES – SEA CHEST – RUDDERS – ANCHOR CHAINS.-> 2 DAYS.
RECEIVED HYDROBLASTING – PAINTING: GARAGE AREAS – EXTERNAL DECKS.

SANTA IRINI

TYPE: HIGH SPEED CRAFT
DIMENSIONS: L:224 W:32
DURATION OF WORKS: 6 DAYS
MAY 2023
SPANOPOULOS SHIPYARDS

SHIP BERTHED IN DRYDOCK.
RECEIVED HULL UNDERWATER AREA: HYDROBLASTING EQUAL TO SA2.5 CLEANLINESS – SILICON PAINTING.
RECEIVED LOWER & UPPER GARAGE CLEANING – ENGINE ROOM CLEANING.

AGIA DYNAMI

TYPE: BULK CARRIER
DIMENSIONS: L:179 W:28
DURATION OF WORKS: 3 DAYS
JUNE 2023
SPANOPOULOS SHIPYARDS

SHIP BERTHED IN DRYDOCK.
RECEIVED HYDROBLASTING 1500 BAR – PAINTING: UNDERWATER HULL AREA – TOP SIDES – SEA CHEST – RUDDERS – ANCHOR CHAINS.

SANTA MARIA

TYPE: BULK CARRIER
DIMENSIONS: L:225 W:32.2
DURATION OF WORKS: 6 DAYS
JUNE 2023
SPANOPOULOS SHIPYARDS

SHIP BERTHED IN DRYDOCK.
RECEIVED HYDROBLASTING 1500 BAR – PAINTING: UNDERWATER HULL AREA – TOP SIDES – SEA CHEST – RUDDERS – ANCHOR CHAINS.
RECEIVED HYDROBLASTING – PAINTING : AT CARGO HOLDS – TOP SIDES – HATCH COAMINGS – HATCH COVERS – DECK.

NISSOS SAMOS

TYPE: RO-PASSENGER
DIMENSIONS: L:193 W:29.4
DURATION OF WORKS: 8 DAYS
MARCH 2023
PERAMA SHIP REPAIRS ZONE

SHIP BERTHED IN DRYDOCK.
RECEIVED HULL UNDERWATER AREA: HYDROBLASTING EQUAL TO SA2.5 CLEANLINESS – SILICON PAINTING.
REST HULL AREA – TOPSIDES – SEA CHEST – RUDDERS – STABILIZERS: HYDROBLASTING – PAINTING.
ALONGSIDE WITH MARKING : ANCHOR CHAINS – PLIMSOL MARKS – DRAFT MARKS – NAME – REGISTRY.
GARAGE AREAS: HYDROBLASTING EQUAL TO SA2.5 CLEANLINESS – PAINTING.
EXTERNAL MAIN DECK AREAS: HYDROBLASTING 1500 BAR – PAINTING .

OCEAN BEAUTY

TYPE: BULK CARRIER
DIMENSIONS: L:179 W:29
DURATION OF WORKS: 7 DAYS
JUNE 2023
PERAMA SHIP REPAIR ZONE

SHIP BERTHED IN DRYDOCK.
RECEIVED HYDROBLASTING 1500 BAR – PAINTING UNDERWATER HULL AREA – TOP SIDES – SEA CHEST – RUDDERS – ANCHOR CHAINS.
RECEIVED HYDROBLASTING 1500 BAR – PAINTING – STRIPES AT CARGO HOLDS – TANK TOP – HATCH COAMINGS – HATCH COVERS – DECK.

OCEAN LADY

TYPE: BULK CARRIER
DIMENSIONS: L:189 W:32
DURATION OF WORKS: 7 DAYS
MAY 2023
PERAMA SHIP REPAIR ZONE

SHIP BERTHED IN DRYDOCK.
RECEIVED HYDROBLASTING 1500 BAR – PAINTING: UNDERWATER HULL AREA – TOP SIDES – SEA CHEST – RUDDERS – ANCHOR CHAINS.
RECEIVED HYDROBLASTING 1500 BAR – PAINTING – STRIPES : AT CARGO HOLDS – TANK TOP – HATCH COAMINGS – HATCH COVERS – DECK.

OCEAN MASTER

TYPE: BULK CARRIER
DIMENSIONS L:189 W:32
DURATION OF WORKS 7 DAYS
JUNE 2023
PERAMA SHIP REPAIR ZONE

SHIP BERTHED IN DRYDOCK.
RECEIVED HYDROBLASTING 1500 BAR – PAINTING UNDERWATER HULL AREA – TOP SIDES – SEA CHEST – RUDDERS – ANCHOR CHAINS.
RECEIVED HYDROBLASTING 1500 BAR – PAINTING – STRIPES AT CARGO HOLDS – TANK TOP – HATCH COAMINGS – HATCH COVERS – DECK.

PG GAS PIONEER

TYPE: LPG TANKER
DIMENSIONS: L:88 W:15
DURATION OF WORKS: 4 DAYS
OCTOBER 2021

SHIP BERTHED IN DRYDOCK AND RECEIVED HULL – BOW THRUSTER – SEA CHEST – RUDDERS – ANCHOR CHAINS.
ALONGSIDE WITH PLIMSOL MARKS – DRAFT MARKS – NAME – REGISTRY : HYDROBLASTING – PAINTING – MARKING.

M/V LAVRIO

TYPE: BULK CARRIER
DIMENSIONS: L:179 W:28
DURATION OF WORKS: 5 DAYS
SEPTEMBER 2021

SHIP BERTHED IN DRYDOCK AND RECEIVED HYDROBLASTING – PAINTING : HULL – SEA CHEST – RUDDERS – ANCHOR CHAINS.
ALONGSIDE WITH MARKING : PLIMSOL MARKS – DRAFT MARKS – NAME

M/V MAKRA

TYPE: BULK CARRIER
DIMENSIONS: L:196 W:32.2
DURATION OF WORKS: 5-6 DAYS
APRIL 2022

SHIP RECEIVED HYDROBLASTING – PAINTING AT CARGO HOLDS – TOP SIDES – HATCH COVERS.

CORAL PIRAEUS SHIP REPAIR PC 

14, SKOUZE STR. 185 36 PIRAEUS GREECE – TEL.: 2104520060-1 – FAX: 2104599659 – E-mail: info@coral-piraeus.gr